Sichuan-tibet Line project
Sichuan Tibet Line Project
China Railway 14th Bureau Group, Sichuan-tibet Railway construction project undertaken by China Railway 12th Bureau Group, Whole field construction, Most have no municipal electricity, Engineering construction equipment, Such as tunnel air compressor, Steel processing plant equipment, Fan and mixing plant equipment, winch. The project has a high altitude, The power loss of diesel generator set is large, It is difficult to start the equipment in autumn and winter.
Scheme description
? ?According to the site load conditions and characteristics, Subbid section wins the bid 4 office, Form a unique supply advantage: disposition 400-560KW Volvo and Yuchai diesel generator sets with different power segments, All diesel generator sets are equipped with cloud monitoring, Realize the dynamic monitoring of the running condition of diesel generator set.