China Railway First Bureau
China Railway First Bureau
China Railway First Bureau is in Colombia Mar2 Highway project, The construction period of the project is long, The municipal power supply at the construction site is unstable, Unable to load engineering construction equipment, Such as tunnel air compressor, Steel processing plant equipment, Fan and mixing plant equipment, Power supply requirements for winches and living areas.
Scheme description
The project is configured 67 Taiwan silent Euro three emission Yuchai unit, proximal 40 Taiwan 300KW Silent parallel operation, To meet the on-site power supply needs. During the epidemic, Many units on the project site could not supply power normally due to the lack of maintenance for a long time, Our first time to arrange experienced engineers rushed to the scene to deal with the problem and inspection, Ensure normal power supply of the unit, To meet the on-site power supply demand and construction period.